This is my Manhattan to celebrate the end of construction for the weekend. Our house is about 30’ from a 300’ vertical bank. It’s glacial till, (hardpan) and hasn’t moved in the 30 years we’ve been here other than a little topsoil slugging at the edge. But climate change is real, and we decided we needed a sleeping pill for the rainy season. So we are having the edge seriously reinforced as preventative maintenance. They are drilling 18’ caissons with steel wideflanges into the hardpan at 4’ o. c. These cantilever vertically to hold the bank in place. After several weeks, the drilling platform is in place and they’ll start drilling Tuesday.
Cheers!