Results 1 to 15 of 15

Thread: Pipe Rudder Sequential Construction Photos (51 pics)

  1. #1
    Join Date
    Jun 2003
    Location
    Seabeck, WA
    Posts
    11,020

    Post

    Originally posted by boatlover:
    Bob,

    Parts 1 through 3 were posted before the new machine. Most, but not all, the info is in the pictures, which now show only the little red x's.

    You probably don't like to chew your cabbage twice, but could you ..... ?
    Too hard to fix what’s broke, so here’s the whole shebang. Download them if you want them for reference.

    Gardner’s Plan from The Dory Book:



    Marine brass and red brass from McMaster Carr:



    Layout:



    Cutting, Shaping and Fitting:












    Continued…

  2. #2
    Join Date
    Jun 2003
    Location
    Seabeck, WA
    Posts
    11,020

    Post









    Turning, Milling and Threading with Blacksmith-Machinist Mel Ensor:









    Continued…

  3. #3
    Join Date
    Jun 2003
    Location
    Seabeck, WA
    Posts
    11,020

    Post

    Pouring Decorative Lead Weight:









    Laminating Rudder Thwart and Tiller Yoke To Match Camber:





    Boring and Plumbing Shaft Hole:






    Continued…

  4. #4
    Join Date
    Jun 2003
    Location
    Seabeck, WA
    Posts
    11,020

    Post









    Installing Hull Reinforcing Block and Rudder Stock:





    Determining Shaft/Rudder Stock Length and Yoke Alignment:






    Continued…

    [ 02-19-2005, 01:56 PM: Message edited by: Bob Smalser ]

  5. #5
    Join Date
    Jun 2003
    Location
    Seabeck, WA
    Posts
    11,020

    Post



    Milling Shaft for Rudder Housing:



    Hard Silver Brazing Rudder Housing and Shaft:











    Cleanup and Fairing Joints and Flaws with Soft Solder:




    Continued…

  6. #6
    Join Date
    Jun 2003
    Location
    Seabeck, WA
    Posts
    11,020

    Post







    Bedding Hardware in Epoxy:



    Sheathing with 2 Layers of 4 oz Cloth and Finishing Woodwork:





    Boring for and Fabricating Pivot Pin:



    One end is threaded and the other brazed to make a perfectly-symmetrical “bolt”, and a fitted bronze bushing was installed in the rudder blade.

    Yoke Hardware Fabricated and Temporarily Installed:




    Continued…

    [ 02-19-2005, 02:00 PM: Message edited by: Bob Smalser ]

  7. #7
    Join Date
    Jun 2003
    Location
    Seabeck, WA
    Posts
    11,020

    Post

    Rudder Assembled and Tested for Fit and Function:







    Then disassembled for final touchup waiting completeion of the rest of the boat.

    Nuts/shafts will be bored and bronze cotter pins installed during final assembly.

    [ 02-19-2005, 02:10 PM: Message edited by: Bob Smalser ]

  8. #8
    Join Date
    Jan 2000
    Location
    Portland, Maine
    Posts
    10,978

    Post

    Saved it! Thanks for all your efforts, Bob. I know it's extra work to document things like this and we sure do appreciate it.

    Steven

  9. #9
    Join Date
    Oct 2004
    Location
    Boston
    Posts
    664

    Post

    Bob, I'm not a huge fan of epoxy so I'm not too sure about this but how well will that epoxy Double D-hole hold up on the tiller yoke to the torque on the shaft? Will it fracture or round out?

  10. #10
    Join Date
    Jun 2003
    Location
    Seabeck, WA
    Posts
    11,020

    Post

    Originally posted by maa. melee:
    ...how well will that epoxy Double D-hole hold up on the tiller yoke to the torque on the shaft? Will it fracture or round out?
    The yoke bearing plate absorbs the torsional stress of turning the rudder....not the epoxy.



    [ 02-19-2005, 08:56 PM: Message edited by: Bob Smalser ]

  11. #11
    Join Date
    Apr 2004
    Location
    Oxon Hill, MD
    Posts
    178

    Post

    Bob, ... Sir,

    Many thanks !

    I got the file on my hard drive. (I may have to move it to the secondary HD for space considerations, but that is MY problem.)

    Again, many thanks !

    Regards,

    Ed R

    (Edited to remove a mis-statement. As I paged down to the end, some of the pictures had not yet come up, and there were some red x's. On going back to the top, and paging down again: no more red x's !)

    [ 02-19-2005, 10:49 PM: Message edited by: boatlover ]

  12. #12
    Join Date
    Oct 2004
    Location
    Boston
    Posts
    664

    Post

    Ah I see it now Bob. Guess I was distracted by the fine job you did to notice! Nice work and thanks.

  13. #13
    Join Date
    Dec 2001
    Location
    Sth Coast NSW, Australia
    Posts
    674

    Post

    Bob, great post and fine work.

    Thanks,
    Lion.

  14. #14
    Join Date
    Aug 2003
    Location
    Vancouver, BC
    Posts
    394

    Post

    Very cool. Any chance we can see her in PT in September?

  15. #15
    Join Date
    Jun 2003
    Location
    Seabeck, WA
    Posts
    11,020

    Post

    Originally posted by chergui:
    Very cool. Any chance we can see her in PT in September?
    We'll see.

    Labor Day is when I realize I'm way behind on all I gotta get done before the November rains begin.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •