Page 1 of 5 12 ... LastLast
Results 1 to 50 of 215

Thread: progress

  1. #1
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default progress

    some progress on the boat


    Jake
    Last edited by SV Papillon; 10-27-2010 at 09:14 PM. Reason: bad link

  2. #2
    Join Date
    Dec 2005
    Location
    Seattle. WA
    Posts
    17,235

    Default

    Go Jake! Looks great.

  3. #3
    Join Date
    Nov 2004
    Location
    Port Townsend WA
    Posts
    6,685

    Default

    Darn good work!
    Jay

  4. #4
    Join Date
    May 2006
    Location
    Seattle, WA
    Posts
    523

    Default

    Wow!

    Thanks for all the nice pics!
    Quote Originally Posted by Yeadon View Post
    Double-enders are optimistic.

  5. #5
    Join Date
    May 2006
    Location
    Seattle, WA
    Posts
    523

    Default

    Where in Lake Union is Papillion? (and is there access for lookie-loos?)

    I am on the Westlake side near China Harbor (*shutter*)...
    Quote Originally Posted by Yeadon View Post
    Double-enders are optimistic.

  6. #6
    Join Date
    Nov 2006
    Posts
    5,448

    Default

    Very interesting albums and nicely done work. Good luck with it.

    Jim

  7. #7
    Join Date
    May 2000
    Location
    St. Louis, MO
    Posts
    12,524

    Default

    Awesome Work!!
    Nothing else matters but how I raise my children ... and their opinion of me, as a father.

  8. #8
    Join Date
    Jul 2002
    Location
    Seattle, WA
    Posts
    7,500

    Default Re: progress

    Bakketon & Thomas

    They do good work there. Nice guys as well.

  9. #9
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Finally got the carmera working and a little time to get some more done on the inside

    Before



    now









    Last edited by SV Papillon; 09-29-2010 at 08:13 PM. Reason: forgot so much
    Schooner Sassafrass Rebuild Blog Web Album

  10. #10
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    lights





    fwd beams capped



    water tanks in



    Schooner Sassafrass Rebuild Blog Web Album

  11. #11
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    head








    port sette shelf
    the carlin caps and these are all recycled berths from a fishing boat I used to work on, they were going in the dumpster and a friend saved them



    house/shop/ very nice wife







    thats all for now, whole project is in the link on the signature

    Jake
    Schooner Sassafrass Rebuild Blog Web Album

  12. #12
    Join Date
    Aug 2005
    Location
    SF Bay Area- Richmond
    Posts
    12,233

    Default Re: progress

    Nice work!
    "The enemies of reason have a certain blind look."
    Doctor Jacquin to Lieutenant D'Hubert, in Ridley Scott's first major film _The Duellists_.

  13. #13
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Refit measured in kid years

    going through pics and realized just how long this is taking

    Kido and Nemo at 2 just moved on board



    3 insanity has started



    4 or 5



    and 6



    and he's still around too

    Schooner Sassafrass Rebuild Blog Web Album

  14. #14
    Join Date
    Nov 2004
    Location
    Guerneville,CA
    Posts
    4,132

    Default Re: progress

    A lot of very fine workmanship! Thanks for showing us your photos!
    Those that fall behind will be left behind! Arghhhh

  15. #15
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Settes almost done need to plumb the water tanks and the backs can get buttoned up






    Battery box



    storage port



    extra long pilot berth



    starting on the head

    Schooner Sassafrass Rebuild Blog Web Album

  16. #16
    Join Date
    Aug 2002
    Location
    Belleville Ontario
    Posts
    19,681

    Default Re: progress

    Wow, great work.

  17. #17
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Head counter and locker door





    Trying to get some refinishing done on the mast with the nice weather of late, hope to step it this fall







    Schooner Sassafrass Rebuild Blog Web Album

  18. #18
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Getting close on the head

    counter is done just need to build the locker face







    shower and Bob Cleek recommended RV tub ready for tile





    Schooner Sassafrass Rebuild Blog Web Album

  19. #19
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Making some progress in the V berth, portlights trimmed, berth framed, hanging locker in









    First time putting tile in, home of the Little Cod when I get the heat shields in



    Thats all for now

    Jake
    Schooner Sassafrass Rebuild Blog Web Album

  20. #20
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default little Cod



    Schooner Sassafrass Rebuild Blog Web Album

  21. #21
    Join Date
    Dec 2005
    Location
    Seattle. WA
    Posts
    17,235

    Default Re: progress

    Epic job, Jake. Miss you around the old dock. The new management has been an improvement, and they fixed up your old space.

  22. #22
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Thanks Lew,

    The girls seem to be doing a good job, pooring alot of money into the place. Don't make it over to the Rita house as it is off the path now. Had to put in my first order for new lumber today with John Thomas. Burned through about 3500 BF of silver bali and 500 bf of angelic so far. Spent half the day digging through the various cut off piles to find enough angelic t&g to finish the v berth.

    Jake
    Schooner Sassafrass Rebuild Blog Web Album

  23. #23
    Join Date
    Oct 2007
    Location
    Fort Collins, Co
    Posts
    4,918

    Default Re: progress

    epic, very good looking boat.
    In fact, if you can saw a penciled line, apply glue, drive nails, and bring a modest measure of patience to the task, you can build and launch a smart and able craft in as few as 40 work hours. You need not be driven by lack of tools, materials, skills, or time to abandon in frustration a project you conceived in a spirit of pleasurable anticipation.

    -Dynamite Payson

  24. #24
    Join Date
    May 2006
    Posts
    1,366

    Default Re: progress

    Just beautiful work. Great progress!
    "The desire to build a house is the tired wish of a man content thenceforward with a single anchorage. The desire to build a boat is the desire of youth, unwilling yet to accept the idea of a final resting place." -Arthur Ransome

  25. #25
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    A little more, started framing aft, have a pretty good idea on the pilot house layout, or at least not as many ??. A little more prep and the fuel tank can go in under the cockpit.







    Starting to trim out lockers etc





    That's all for now

    Jake
    Last edited by SV Papillon; 11-13-2010 at 04:00 PM.
    Schooner Sassafrass Rebuild Blog Web Album

  26. #26
    Join Date
    Dec 2005
    Location
    Seattle. WA
    Posts
    17,235

    Default Re: progress

    I am surprised they aren't just all over this. Maybe it helps that I know what she looked like when you started and how much you have put into this project.

  27. #27
    Join Date
    Feb 2007
    Location
    Seattle
    Posts
    3,649

    Default Re: progress

    What a fantastic job going on there. Spectacular.

  28. #28
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    A little timeline

    purchase







    tearout





    Schooner Sassafrass Rebuild Blog Web Album

  29. #29
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    structure work starts











    Schooner Sassafrass Rebuild Blog Web Album

  30. #30
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress





    my first lofting







    Schooner Sassafrass Rebuild Blog Web Album

  31. #31
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress











    Schooner Sassafrass Rebuild Blog Web Album

  32. #32
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress











    Last edited by SV Papillon; 11-14-2010 at 03:23 PM.
    Schooner Sassafrass Rebuild Blog Web Album

  33. #33
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Starting on the interior





    That is pretty much up the previous pics

    Jake
    Schooner Sassafrass Rebuild Blog Web Album

  34. #34
    Join Date
    Jan 2000
    Location
    Portland, Maine
    Posts
    10,987

    Default Re: progress

    Wow! Thanks so much for sharing all these great pictures. Fantastic work!



    Steven

  35. #35
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    As I don't think I've said it, Thanks for the positive feedback. All criticisms welcome as well. I don't post much but do read a fair bit and certainly respect the wealth of expirience on here. It's been a slow go as I spend half the year at sea for work but we are closing in to moving day.

    Jake
    Schooner Sassafrass Rebuild Blog Web Album

  36. #36
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    A little more framing aft, off to work in the mourning.







    Jake
    Schooner Sassafrass Rebuild Blog Web Album

  37. #37
    Join Date
    Dec 2005
    Location
    Seattle. WA
    Posts
    17,235

    Default Re: little Cod

    Jake,

    Tell the people about the boat. A bit of background.......

  38. #38
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: little Cod

    Quote Originally Posted by Lew Barrett View Post
    Jake,

    Tell the people about the boat. A bit of background.......
    Don't have alot of history. What we were told---

    Brief Bio-

    Built in Vietnam 1962-63 by US navel officer
    Supposedly sunk 1965 0r 1967
    At some point early 1980's showed up in southern Ca was named "Goodwind" somebody did a fair amount of work in this period, hull was refastned foremast had a repair etc..
    It was also reported that it was used in youth non-profit in San Diego late 1980's

    1997 previous owner Worth Brown, a retired shipwright from Florida, he built the boat "Hootman" which won the 1957 Havanna Cup (used to be a article out there online), bought her in long beach at age 90. With the help of his son and son in law 60's and 70's they sailed up the coast to Seattle in Oct ??

    2004 or 2005 I bought the boat, let Worth stay on it till the fall when I moved up from PV, Worth passed away the week before we moved on. He had planned to cruise to AK and had gutted the interior putting in a basic replacement.

    We stayed on board for six months then started a 2 year refit Ha Ha Ha Ha Ha Ha!

    What year is it????????

    Jake

    PS If anyone has any info on the boat or remembers it from Ca I would very much like to get any history I can
    This is a pic of her hauled out in ca then named "Goodwind"

    Last edited by SV Papillon; 11-17-2010 at 09:06 PM.
    Schooner Sassafrass Rebuild Blog Web Album

  39. #39
    Join Date
    Jan 2003
    Location
    France & Viet Nam
    Posts
    2,214

    Default Re: progress

    WOW, Jake!!!

    I remember, quite a while ago, when you showed this horrendous "bricolage" on the foremast (and the near escaped accident when it fell down!), but sorry I had not noticed the new jobs.

    So, I just spent the best of my morning going through all the pictures from the beginning (and yes: your little girl has grown up a bit!!!) and congratulate you for the nice and great amount of work you have done since that time. She is a whole different boat now!

    Your deck - since you asked about it - looks pretty good on the pictures (although 1", which you said was it's present thickness, effectively sounds just that little bit thin for a boat of this size), but it's not possible to say more with the pictures you have. I guess (?) that you will replace the capping rail and the stringer that runs long the inner side, so it will be easier to have a good look all-round the stanchions then.

    I saw that you have replaced the old tie-rods that were going from the beam clamp to the roof carlins by new ones...but why did you make them so long since they are now from the beam side to the carlin???? You could just as well have these angle bars right against the carlin, just allowing for the dove tails, which had opened due to over-caulking, to re-tighten up...and save all this S.S. threaded rod. Would look more neat too.

    Your new roof is a huuuuge improvement compared to the not-so-pretty earlier one, and Tad Robert designed future wheelhouse will be just fine....and so comfortable! Just curious: it looks like the companionway sill will be over the top of the aft cabinside, and not cutting through it for easier access... Is that right???

    It is impossible to say for sure from the pictures either, but the whole boat very much looks like made from "Sao" wood. How well it has accepted the many iron/ steel fittings and nails make me almost certain that it is this wood, which was the top choice in South Vietnam, where she was built...and for an American engineer certainly, who will have designed many fittings (and perhaps the whole boat, actually!). These mast collars are definitely an engineer's job! He imported many top quality fittings too...but left to the Vietnamese to make this steering with what was available! Not going t break down easily...just hope it does not make too much "klong-klong-klong" with this Universal joint

    Keep up the good job

    Luc
    Last edited by Lucky Luke; 11-22-2010 at 11:54 PM.
    "Homme libre, toujours tu cheriras la mer" (Charles Baudelaire)

  40. #40
    Join Date
    Oct 2005
    Location
    Montreal
    Posts
    6,477

    Default Re: progress

    A wonderfully inspiring thread and an absolutely impressive-as-all-get-out ton of first class workmanship. I can just barely imagine what it must have been like in the earlier stages during tear out time and what must have appeared as terribly daunting bit of work ahead. A+++ for brute determination and stick-to-itness!!!

    Continued great success!!


    Cheers!


    Peter
    Do it,do it,do it,do it,do it,do it,do it,now!
    J.Lennon

    This boat was built with ten thumbs.No fingers were harmed in anyway.

  41. #41
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Thanks for the kind words Luc and Peter.

    Luc,

    I think the tie rod location was to get away from the end of the stub beams, it's what the shipwrights wanted to do. The cap rail will be a work in progress as you said it is very hard to get in there. Tad has been great about steering the vision and emphasising what can wait. The cockpit being one, we will eventually take it back one deck beam and put the wheel directly on the worm gear at a slight angle, It is pretty tight with the binacle installed. The companion way is a work in progress, I wasn't sure where to put it so I finished out the aft side of the house and will cut it in when the boat tells me where. Alot will depend on how the pilot house comes together, center port stbd etc. I'm going to look up "Sao" wood now

    Jake
    Schooner Sassafrass Rebuild Blog Web Album

  42. #42
    Join Date
    Dec 2008
    Location
    Pacific Ocean
    Posts
    1,318

    Default Re: progress

    I was scrolling thru the pictures and noticed the porthole in the hull forword and was thinking that looks familiar. Then when I saw it was named Goodwind, it all came together. I was the guy that refastened the hull and built the engine bed, not sure of the year but early 80's seems right. She was bought by a guy named Larry Hammond, he and a friend had visions of starting a charter biz, they bought the schooner Dreamer at the same time. Dreamer was really far gone at the time and a 100K redo was out of the question. We redid all the standing and running rigging in Del Ray and headed on down to Newport to get the almost dead engine looked after.The engine croaked on the way so we sailed her back up to Long Beach Marina boat yard to make the change out, that's where we refastened the hull and shined her up. I heard he putzed around with her a bit than leased her out to a guy that fished her (she had a realy long rang under power) It's great to see a new interior, the one she had just wasn't right.
    Good to see she's still around and your doing a great job.

  43. #43
    Join Date
    Jul 2007
    Location
    Mandurah, Western Oz....or Wongawallan Qld......or....er..somewhere in-between
    Posts
    12,897

    Default Re: progress

    As Peter said, such a brilliantly inspiring thread Jake. Fantastic to see how far you've come with this and the simply excellent work that you've been doing.
    Larks

    "Be who you are and say what you feel...
    Because those that matter...don't mind...
    And those that mind.... don't matter."

    LPBC Beneficiary
    We're the only species on earth that claims to have a god...and the only species on earth that lives as if we don't have a god.
    (US Journalist Paul Kelly on advice from the crayfish)

  44. #44
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Thanks for the comments Larks. Tallboy great to have finally found someone connected to the boat in the early days. The running rigging held up great, especially since it was circa early 80s, I have 3 5 gallon buckets of blocks I will take with me fishing and pull them apart and rework. The fastening job you did seems to have held up great. There was some funky work done up here around the clamp bolts that will require dutchmen to repair, I met the guy who did it and he said he didn't want too but it was what the owner wanted. It looked like it originally had copper coated boat nails and copper rivets in the butt blocks. Also rather odd was it was caulked from the waterline down but edge set from there up. Tallboy since you said you sailed from delray to long beach, how did the hull feel? Track well, stability etc any comments appreciated.

    Jake
    Schooner Sassafrass Rebuild Blog Web Album

  45. #45
    Join Date
    Feb 2002
    Location
    Shubenacadie NS
    Posts
    2,545

    Default Re: progress

    Nice boat. More pics please

  46. #46
    Join Date
    Oct 2006
    Location
    Lake union Seattle
    Posts
    551

    Default Re: progress

    Little Cod done



    Jake
    Schooner Sassafrass Rebuild Blog Web Album

  47. #47
    Join Date
    Jul 2007
    Location
    Mandurah, Western Oz....or Wongawallan Qld......or....er..somewhere in-between
    Posts
    12,897

    Default Re: progress

    Nice!!!!
    Larks

    "Be who you are and say what you feel...
    Because those that matter...don't mind...
    And those that mind.... don't matter."

    LPBC Beneficiary
    We're the only species on earth that claims to have a god...and the only species on earth that lives as if we don't have a god.
    (US Journalist Paul Kelly on advice from the crayfish)

  48. #48
    Join Date
    Apr 2005
    Location
    Hills of Vermont, USA
    Posts
    9,034

    Default Re: progress

    Absolutely beautiful!

  49. #49
    Join Date
    Nov 2006
    Location
    Seattle, Wa USA
    Posts
    742

    Default Re: progress

    Is this still the plan for the pilothouse? It's going to look great.
    -- Tom (boating blog)

  50. #50
    Join Date
    Jun 2003
    Location
    north carolina
    Posts
    209

    Default Re: progress

    I'm late coming to the story... Very impressive. Please keep the updates coming.

    Paul T

Similar Threads

  1. slow building progress on Janetess
    By Cecil Borel in forum Building / Repair
    Replies: 9
    Last Post: 01-24-2007, 11:05 PM
  2. Progress in Iraq...NOT
    By Norman Bernstein in forum The Bilge
    Replies: 74
    Last Post: 10-10-2006, 07:29 PM
  3. Eun Mara Progress
    By HR in forum Building / Repair
    Replies: 26
    Last Post: 09-07-2006, 09:14 PM
  4. Progress photos, itty bitty boat.
    By almeyer in forum Building / Repair
    Replies: 5
    Last Post: 08-11-2006, 07:43 PM
  5. Troller Conversion Progress
    By Terry Etapa in forum Building / Repair
    Replies: 8
    Last Post: 11-11-2001, 05:53 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •