My current build is being put on hold for a month or so and I bought a fair pile by my standards, seven sheets of occume.

I have it neatly stacked, on a sheet of cheap ply, on a flat (not quiet level) floor. It is in a climate controlled room in a dehumidified basement.

Can I get away with 6-12 weeks?

Thanks!