This weekend, more metal bashing, two pieces were cut off the old flat bed for use. The rest of the flat bed was cut into useable pieces for the might come in handy pile.
The smaller piece goes between the sides of the previously processed section, it will spread the weight of the boat onto the axle. That piece has now been trimmed to size and cleaned up for painting.
The larger piece goes at the front end of the section that will have the keel resting on it. It goes from side to side transferring the weight onto the A frame of the Trailer, 40 inches forward of the Axle. It's been trimmed roughly, and dry fitted. It just needs a little fettling, then derusting, before painting with the little piece.
I was going to weight the trailer but the bathroom scales failed.. They are 30 years old plus .. A new set has been ordered.
The trailer needs to be raised up to work on it, I'm going to get some foundation blocks this week for the purpose, they will be used later to raise up the boat to fit the keel..
More playing with the PRHF spread sheet seems to indicate a Norfolk Handicap of about 13%, that's slightly faster than an Enterprise but slower than a Laser. I need to do more work on the spreadsheet though to add more information.
4 MDF sheets were demolished into sections for shelving and uprights in the library
Three more shelves were installed, as were two uprights for the next section of shelving. |