The lower (future port side) half of the mast is held in the jig with wedges and blocks, protected from epoxy with plastic bags.
20200830_161929.jpg
All set up and ready to glue.
20200830_165846.jpg
It's warm in the garage this evening, so I applied cold packs to the epoxy containers.
20200830_181135.jpg
Sorry, there are no action shots of the epoxy application. Here, the glue up is completed. There are 24 clamps in the photo.
20200830_200018.jpg