    Default Changing the boats around in the boat yard and the workshop


    Now in the finishing jobs on this Hardy 25 which should be leaving the boatyard early next month for its new home in the River Severn

    Then there will be a change in the boatyard and the workshop as boats goon to different stages of their refits,


    Now that the carpets in the cabin are now finished being glued in position it is time to fit the bunk boards jig saw puzzle to being to be fitted



    The last of the removable bulkheads now back in position and the head linings can start to be fitted back in position







    The blocks to fit on the bulkhead at each end and the shelf can go back in position





    Just got to make and fit the blocks to fit each end of the shelf







    The main bunk top boards back in position and just need to be fixed the back set in position







    Come a long way in getting the interior back the way it was when the boat left Hardy Marine 35 years ago





  2. #2
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The first of the shelves going back into position



    The bunk Tops back in position now it just needs the cushions to finish this part off







    Apart from putting thestarboard board back in position after the locker is painted out the only bit missing is the cushions for the front berths







    A fresh coat of paint in the rest of the lockers to finish off the inside of the lockers




  3. #3
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The cockpit boards get set out ready to make a new set to match the rest of the cockpit panelling



    The forward end of the cabin now finished off apart from putting back the cushions and back rests on the shelves







    The two cockpit locker panels now all varnished ready for their final coat of satin varnish to go on in the last week before it goes back to its ownebr />








    The cockpit bulkheads have been rubbed down and given several coats of varnish to bring them back to life as best as they can be and they have come up well






  4. #4
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The fore cabin infill to make the front berths into a double berth and also so it can be used as a cockpit table as well



    The main cabin table now with a fresh coat of varnish to make it look like the rest of the newly varnished wood work in the cabin







    The cabin step back in position







    The floor carpet relaid in the cabin to show the new blue hull and berth carpets and make it look like it should be all blue carpeted





  5. #5
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The first of the creature comforts to have when cruising with young children who wish to watch TV or play a video game.





    Always needed when cruising a place to cook dinner or a light snack







    Looking more homely just got to get the solar panel fitted on the cabin roof and the head lining panels can go back up and it will begetting there





  6. #6
    Join Date
    Dec 2012
    Location
    Providence, RI USA
    Posts
    1,511

    Default Re: Changing the boats around in the boat yard and the workshop

    Lovely work. I enjoy following the jobs you do.

    This has probably been asked and answered, but is there any chance for larger photos?

    Anyway, thanks for sharing your work!

    Mike
    "near it, a small whale-boat, painted red and blue, the delight of the king's old age."

  7. #7
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The new side and aft panelling being made and fitted to enclose the aft end of the cockpit,



    The aft panelling is made into lockers while the side panelling covers the blocks and fixings for the aft cleats which are fitted to the cockpit sides















    The locker doors in position and just needing edge trimming and the hinges fitted to the fold down doors which are the aft cockpit lockers





  8. #8
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The cockjpit locker panels have now been varnished and are ready to have their satin coats of varnish before they go back in position



    It is amazing how a few coats of varnish can transform the finish on the teak faced panels and how they will bring the cockpit to life







    The windows have arrived and are just going to get the covering removed from round the edges where they sit in the rudder trim and get sealed in with new sealant





  9. #9
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The first of the new cabin windows to go in place in a lot of years and the last set were only sealed part of the way round


    The port side in place



    Just the front and the starboard side windows to go in place




  10. #10
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The windows and rubber surrounds that were removed leaked was because they were only sealed along the top edge. As seen in the first three photos. This is not the way they came out of Hardy Marine as the colour of the sealant is wrong, as it was black sealant that was put in the windows.






    The last three windows fitted and now needs the sealant and insert fitted to finish the job off and ensure the windows are sealed.




  11. #11
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The first thing you have o do is run lengths of 4 mm light line to 2 ft lengths and put them through the lacing eyes on the hull



    Then put them through the centre of the rope fender and tie them off



    The tension up the rope fender around the transom



    Then tie off the ends with more light line and the job is finished apart of cutting off the ends of the lines and sealing them off


  12. #12
    Join Date
    Jun 2017
    Location
    spicewood, texas, usa
    Posts
    326

    Default Re: Changing the boats around in the boat yard and the workshop

    nice work as usual!

    jim

  13. #13
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The next Finesse 24 in for a new deck just being off loaded to start on the deck removal



    This deck as not been off since it was build as seen by the old sealant left on the rubbing strakes and the top of the hull planking







    First area of rot, now after doing a couple of Finesses's it appears to be an area which is to rot







    The extent of the rot appears to be the deck the plank and the back face of the gunwale









    An old Westerly 25 in for a few general repairs before going back on the water for the season





  14. #14
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    Starting to roller and brush on the first coat of Green Gelshield



    The starboard side coated up apart from the areas which need re-glassing the old skin fittings which are going to be drilled in different place when the interior is re-designed







    The port side painted half way







    The last part to be painted







    The bottom now coated up and now as to cured and then the epoxy filler can be applied and the its then time to sand the filler flat and give the bottom a smooth finish once again.







  15. #15
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The cockpit lockers / seats now finished with all the edges trimmed and covered with teak edging tape and ready to varnish



    The first of the lockers/ seats varnished with its first coat of thinned varnish, just five more to go







    The fridge locker all varnished with its first coat of thinned varnish,just has to have the top and bottom vent holes to cut so when the fridge is working there is a flow of air over the cooling plates on the back of the fridge unit







    The port side locker being varnished before cutting out the doorway







    The tops being varnished before fitting them down when the lockers are fitted in the boat cockpit







    Starting to fit the new chainplates into the new position on the hull of the boat and through the deck of the boat.





  16. #16
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The windows are now sealed and the inserts fitted

    The port sides done



    Then the front and finally the







    Starboard side









    All done and the boat can now be washed down





  17. #17
    Join Date
    Jun 2017
    Location
    spicewood, texas, usa
    Posts
    326

    Default Re: Changing the boats around in the boat yard and the workshop

    nice job!

    jim

  18. #18
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    Having cut the slots in the deck to fit the tops of the chain plates through the deck it is now time to bolt the plates to the side of the hull before glassing them in position once the tops are finished off and the toe rails are finally fitted down



    All bolted through and down and now time to fit the toe rails over the chain plates coming out through the deck









    The first coat of Gelshield applied and now the filler being applied to the starboard side







  19. #19
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The first of the headlining panels going back into position



    Then the next headlining panel at the cockpit end







    The large centre panel






    The one over the galley area. Now they are up in position the lights can be re-connected







    One half of the cockpit headlining panel going back up into position and once all the wiring is sorted in the roofspace the second panel can go up position





  20. #20
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    Fitting stainless steel angle brackets to the bottom of the cockpit locker /seats so they are fixed to the cockpit sole with heavy duty brackets so they do not move when out at sea on a rough day



    Re0fitting the new toilet in the toilet compartment to see how it is going to fit in the newly designed compartment





  21. #21
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The patch work starting to appear under the deck sheathing



    Some parts are glued down and screwed and other areas are nailed down and glued and others are just nail gunned down







    Most of it soon far is reasonably sound







    Other parts nor so much with extensive rot in the gunwale and deck beam and the plank





  22. #22
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    The same problem as come to light, the edge are rotten from lack of sealant on deck furniture and the water as found itself getting under the sheathing



    The aft deck is a different plywood to the rest of the plywood on the and as been renewed at some timein the past which the rest of the deck as not been as the aft deck is screwed down







    I clean cut between the two deck plywood on a deck beam, a good idea if the gap between the side of hull and the gunwale was filled in to keep the joint watertight.







    The side deck is nailed down and no sealant in evidence.





  23. #23
    Join Date
    Aug 2011
    Location
    Essex UK
    Posts
    589

    Default Re: Changing the boats around in the boat yard and the workshop

    Making a start on putting the toilet compartment back together again


    The builder plate with the boat number on it, this one is 1216 which makes her an early Hardy 25 with a deep keel used for inland and coastal short runs unlike her sister ships with a little short keel and large stern drives.





    One of the custom locker / seats which had to be made to fit the area left after the boat had a change of fuel tank sometime in the past. The same is true of the Helmsman seat / locker which itself a custom made seat /locker to fit as the the area was not the same as a standard Hardy 25 cockpit layout

    The home for the hotwater heater to run the shower and the sinks in the toilet compartment and the galley



    The engine number to be able to get the bits for the engine conversion to run the hot water heater while underway or away from shore power.