Page 10 of 10 FirstFirst ... 910
Results 316 to 317 of 317

Thread: CLC eastport pram

  1. #316
    Join Date
    Jan 2009
    Location
    se pa (Bristol PA)
    Posts
    3,543

    Default

    Quote Originally Posted by Hugh MacD View Post
    That's very sweet! I really like the color combo, too.
    Thanks Hugh!
    I couldn't agree more!

    the first coat of paint really made me nervous because it stayed tacky for almost 3 days even after I had tested two or three times on new epoxy sanded epoxy and varnished epoxy, but the second coat which is going to be the finish coat, is drying hard. I checked yesterday, cannot make a fingerprint and now matter how hard I push down.

    Need to get some lines up to the ceiling so I can get upside down boat higher up, then I can finish the fillets under the thwarts.



    Sent from my LG-M430 using Tapatalk
    Denise, Bristol PA, Oday30, Anchor Yacht Club, On tidal Delaware River. my current project; http://forum.woodenboat.com/showthre...0-Ducker-Resto

  2. #317
    Join Date
    Jan 2009
    Location
    se pa (Bristol PA)
    Posts
    3,543

    Default

    Yuck, but it had to be done, Only took about a half-hour, have the boat hanging upside down about eyesight height when sitting on the moan...err fillet chair 😧🤣
    Denise, Bristol PA, Oday30, Anchor Yacht Club, On tidal Delaware River. my current project; http://forum.woodenboat.com/showthre...0-Ducker-Resto

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •