Page 3 of 3 FirstFirst ... 23
Results 71 to 83 of 83

Thread: The new project a wooden yachts, Lion 800

  1. #71
    Join Date
    Jun 2016
    Location
    Nikolaev, Ukraine
    Posts
    61

    Default Re: The new project a wooden yachts, Lion 800

    The hull of the yacht has been glued with fiberglass, 2 layers of fabric with a density of 300 g.м2, after laying the first layer was a week and the resin completely polymerized, so before laying the second layer the surface was sanded with a grinding machine.
    All the work on the pasting of the shell took 4 working days.
    Consumption of materials, epoxy resin 45 kg, fiberglass 40 kg.


    More info



  2. #72
    Join Date
    Jun 2016
    Location
    Nikolaev, Ukraine
    Posts
    61

    Default Re: The new project a wooden yachts, Lion 800

    Meanwhile, the construction of the Lion 870 continues, the hull of the yacht is covered with two layers of fiberglass, began to level the hull of the yacht with putty.

    More info


  3. #73
    Join Date
    Jun 2016
    Location
    Nikolaev, Ukraine
    Posts
    61

    Default Re: The new project a wooden yachts, Lion 800

    The surface of the hull Lion 870 is completely leveled with putty.
    More info


  4. #74
    Join Date
    Jan 2010
    Location
    Sweden,Scilly Isles, Siberia
    Posts
    7,721

    Default Re: The new project a wooden yachts, Lion 800

    Is that an epoxy putty? Pre blendid or self mixed? I often struggle to get it right, but not yet purchased any ready mixed fairing compond.

  5. #75
    Join Date
    Jun 2016
    Location
    Nikolaev, Ukraine
    Posts
    61

    Default Re: The new project a wooden yachts, Lion 800

    We use a two-component epoxy putty, the components are mixed immediately before application to the hull of the yacht.

  6. #76
    Join Date
    Jun 2016
    Location
    Nikolaev, Ukraine
    Posts
    61

    Default Re: The new project a wooden yachts, Lion 800

    The hull of the Lion 870 is completely plastered and sanded, painted with the first layer of primer paint


    More info




  7. #77
    Join Date
    Jan 2010
    Location
    Sweden,Scilly Isles, Siberia
    Posts
    7,721

    Default Re: The new project a wooden yachts, Lion 800

    My arms hurt.......

  8. #78
    Join Date
    Jun 2016
    Location
    Nikolaev, Ukraine
    Posts
    61

    Default Re: The new project a wooden yachts, Lion 800

    In fact, it only looks hard, grinding the entire body of the yacht takes several hours )))

  9. #79
    Join Date
    Jan 2007
    Location
    North Shore, Massachusetts
    Posts
    6,253

    Default Re: The new project a wooden yachts, Lion 800

    wow capable cruising craft, how much ballast?

  10. #80
    Join Date
    Jun 2016
    Location
    Nikolaev, Ukraine
    Posts
    61

    Default Re: The new project a wooden yachts, Lion 800

    Balast is 0.65 t, various layout options are available, for example, permanent ballast keel, lift keel or bilge keel.

  11. #81
    Join Date
    Jun 2016
    Location
    Nikolaev, Ukraine
    Posts
    61

    Default Re: The new project a wooden yachts, Lion 800

    Finishing polishing of the yacht body, final painting with a primer

    More info



  12. #82
    Join Date
    Jan 2010
    Location
    Sweden,Scilly Isles, Siberia
    Posts
    7,721

    Default Re: The new project a wooden yachts, Lion 800

    How are you going to do the flip? Crane or man-power?

  13. #83
    Join Date
    Jun 2016
    Location
    Nikolaev, Ukraine
    Posts
    61

    Default Re: The new project a wooden yachts, Lion 800

    At the moment we are considering both options.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •