I'm building a lacewood top on a small nav station for a client, and I am concerned about the warpage of the material when I get it to the boat. Following the suggestion from a friend, I am planning to rip the material down to manageable widths, then spline or Biscuit joint them together for the finished product. The boards are quite dry, and in my garage right now. I am going to take them to the boat to let them adjust before I do the job, so myy question to you is, should I rip it down to smaller widths before I take the rather dry material to the boat, or should I store the full planks on the boat for a while, then rip them down before I begin work?

Reply With Quote
