Entry steps complete and the engine box painted/varnished.
There is still a piece to fill in over the raw water filter that is peeking out.
Today I glued up the basic frame of the towel rack.
It needs to be trimmed around with some Kauri left over from the delayed hatch project.
I also got the lid off the water deck filler and the tank filled up.
The pump when I tested it didn't work, which turned out to be the pressure switch being faulty.
New pump for now, and get a replacement pressure switch, to keep as a spare.
I topped up the diesel tank, and put the second stern anchor, chain and warp into one of the side lockers in the rear deck.
This was possible due to getting rid of the under deck tanks a few years ago.
I fitted some catches to the dinette table to keep it in place when underway.
Slowly ticking my list off.