    Default The restoration of Lady J, week two.

    Time for the weekly update on Lady J. The {ort side of the hull is paint free the old fashioned way, heat gun and scraper followed by longboarding with 220 grit.



    With her in the shop, it's impossible to get a side shot.

    90% of the seams below the waterline are reefed and clean.



    I did find freshly cracked ribs from the tranport.



    The other bilges are full of broken but sistered ribs. I haven't decided whether to fix these or leave them as they are. It's up to the customer.



    and



    Now that the engine is out, I can see a couple in there too. Two have a strange fix already. Somebody took a SS band, bent it to fit on the broken rib and bolted/screwed it in place. The only issue I have with that is that they mixed SS and Bronze in the same piece and the floor bolt only a few inches away is galvanized.

    Program Manager Baggett & Sons Marine Restoration
    http://www.baggett-and-sons.com

  2. #2
    Join Date
    Sep 2007
    Location
    Bellingham, WA.
    Posts
    1,300

    Default Re: The restoration of Lady J, week two.

    My wife Fredia came by to help this week. She was on the mast.



    The rest of the motley crew was on the hull.



    I think this needs replacing...



    And this needs something other than Bondo in it.



    Plenty of work still to do. More next week.
    Program Manager Baggett & Sons Marine Restoration
    http://www.baggett-and-sons.com

  3. #3
    Join Date
    Nov 2004
    Location
    Port Townsend WA
    Posts
    6,666

    Default Re: The restoration of Lady J, week two.

    Looking forward to seeing and reading more about the project. What is the design of the boat?
    Jay

  4. #4
    Join Date
    Sep 2007
    Location
    Bellingham, WA.
    Posts
    1,300

    Default Re: The restoration of Lady J, week two.

    She's a Kettenburg 40, hull number one and formerly Paul Kettenburg's personal boat. Nicely built to heavier scantlings than the normal Kettenburg with 9" centers on the ribs. Her original name was TomBoy II after Paul's Son. His Grandson Tom is keenly interested in the progress of the restoration.
    Program Manager Baggett & Sons Marine Restoration
    http://www.baggett-and-sons.com

  5. #5
    Join Date
    Oct 2009
    Location
    South Puget Sound/summer Eastern carib./winter
    Posts
    7,022

    Default Re: The restoration of Lady J, week two.

    Torture boarding the planking with 220 while the boat has broken frames seems mis- directed energy. Sistering job looks poor. End a sister at a butt block, rather than remove it? That metal band is plain lousy engineering. The frames that broke during transport, I'll bet all the old, below w.l. oak is junk. Are those gribble holes in the plank near the sonar fairing block?!!( Jeeze, I sound like a freakin' grinch)

  6. #6
    Join Date
    Sep 2007
    Location
    Bellingham, WA.
    Posts
    1,300

    Default Re: The restoration of Lady J, week two.

    I hear ya. No, there's abrasion marks along the hull where she did a fair amount of rubbing on something. As for the sonar fairing, they might be gribble marks. Yeah, the sistering looks sorry, as does some of the other work done previously. Just some of the mess I have to correct. I think I spend more time fixing well intentioned screwups on these boats than anything else...
    Program Manager Baggett & Sons Marine Restoration
    http://www.baggett-and-sons.com

  7. #7
    Join Date
    Mar 2008
    Location
    Long Beach, CA
    Posts
    2,233

    Default Re: The restoration of Lady J, week two.

    Those Kettenburgs all seem to bust a bunch of ribs down there in that sharp turn of the bilge. I've worked on a couple of of 38's and a PCC. The 50 I spent some time on wasn't troubled.

    I love those boats. They're So Cal classics.
    Schooner Captains Love to Get Blown Offshore

  8. #8
    Join Date
    Oct 2007
    Location
    Newport Beach , Ca.
    Posts
    1,614

    Default Re: The restoration of Lady J, week two.

    WE had the same problem you have . We tried 2 sisters , witch were easy to remove sense they both failed . The rib ends go fast and I feel like I have a new boat , no movement . you should at lease threw bolt on the spliced area , or rivet like we did , don't depend on just glue . Looks like she had varnished bilges



  9. #9
    Join Date
    Oct 2009
    Location
    South Puget Sound/summer Eastern carib./winter
    Posts
    7,022

    Default Re: The restoration of Lady J, week two.

    THAT"S the way to do it!!

  10. #10
    Join Date
    Sep 2007
    Location
    Bellingham, WA.
    Posts
    1,300

    Default Re: The restoration of Lady J, week two.

    Yep. I hate sisters personally. What to do with the screw holes if I pull 'em? Plug them up with good full depth bungs?
    Program Manager Baggett & Sons Marine Restoration
    http://www.baggett-and-sons.com

  11. #11
    Join Date
    Oct 2009
    Location
    South Puget Sound/summer Eastern carib./winter
    Posts
    7,022

    Default Re: The restoration of Lady J, week two.

    west and 403

  12. #12
    Join Date
    Sep 2007
    Location
    Bellingham, WA.
    Posts
    1,300

    Default Re: The restoration of Lady J, week two.

    Ugh, I'm not a fan of that, although, sealing the plugs in with epoxy would satisfy me. The more I work on these things and deal with the shortcuts taken, the more of a purist I'm becoming. How strange is that?
    Program Manager Baggett & Sons Marine Restoration
    http://www.baggett-and-sons.com

  13. #13
    Join Date
    Jan 2008
    Location
    Bellingham, Wa
    Posts
    1,712

    Default Re: The restoration of Lady J, week two.

    I think thats why the more experienced guys are like that. sick and tired of doing it twice.

    I didn't hear; Whatever became of Oh Joy?
    Member of the Loyal, Mostly-Noble, Elite and Most Ancient order of the Laughing Polar Bear Cap Society.

    I ask out of Ignorance, not Criticism.

  14. #14
    Join Date
    Oct 2008
    Location
    Walney, near Cumbria UK
    Posts
    14,320

    Default Re: The restoration of Lady J, week two.

    Why take the sisters out at all. Are they broken? Are the fasteners leaking? If they aint broke don't fix them.
    It really is quite difficult to build an ugly wooden boat.

  15. #15
    Join Date
    Oct 2009
    Location
    South Puget Sound/summer Eastern carib./winter
    Posts
    7,022

    Default Re: The restoration of Lady J, week two.

    The sisters are not attached to the floors. They are attached to the old, broken,rotten frames. That's why.

  16. #16
    Join Date
    Sep 2007
    Location
    Bellingham, WA.
    Posts
    1,300

    Default Re: The restoration of Lady J, week two.

    Quote Originally Posted by BBSebens View Post
    I think thats why the more experienced guys are like that. sick and tired of doing it twice.

    I didn't hear; Whatever became of Oh Joy?
    She's impatiently waiting her turn again while I try and make some money.
    Program Manager Baggett & Sons Marine Restoration
    http://www.baggett-and-sons.com

  17. #17
    Join Date
    Sep 2007
    Location
    Bellingham, WA.
    Posts
    1,300

    Default Re: The restoration of Lady J, week two.

    Quote Originally Posted by wizbang 13 View Post
    The sisters are not attached to the floors. They are attached to the old, broken,rotten frames. That's why.
    Yep. They are attached to the planking but not the floors.
    Program Manager Baggett & Sons Marine Restoration
    http://www.baggett-and-sons.com

  18. #18
    Join Date
    Oct 2007
    Location
    Newport Beach , Ca.
    Posts
    1,614

    Default Re: The restoration of Lady J, week two.

    Quote Originally Posted by CharlieCobra View Post
    Yep. I hate sisters personally. What to do with the screw holes if I pull 'em? Plug them up with good full depth bungs?
    Charlies we used 1 larger dim. of same wood on the out side and 2 smaller on the inside , same wood , dim. of the screw .



    save your scrapes and line up you plugs , these are too light so they show more .

    Last edited by ramillett; 08-09-2010 at 04:03 AM.

  19. #19
    Join Date
    Oct 2006
    Location
    Dooral Dooral, Eastern Oz
    Posts
    40,104

    Default Re: The restoration of Lady J, week two.

    Great stuff. Good to see the wife at work!
    Carpe the living sh!t out of the Diem


  20. #20
    Join Date
    Sep 2007
    Location
    Bellingham, WA.
    Posts
    1,300

    Default Re: The restoration of Lady J, week two.

    ramillett, nice looking work above.

    Bigfella, yeah, she likes boat work but hasn't had much time to do any because of a real job. At least this time I could pay her for her troubles.
    Program Manager Baggett & Sons Marine Restoration
    http://www.baggett-and-sons.com

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •