My frames are bolted to stringers and the chine log bolted to the frames. If I am eopxying all my joints and meeting surfaces and doing a West system bottom. Are screws sufficient? Or should I reinstall the bolts? I assume in traditional construction the bolts are just giving extra strength at a place where there is going to be some movement and they will hold longer than screws?

Reply With Quote
