Tab Content
  • bheys's Avatar
    08-12-2018, 01:00 AM
    Today I finished the last eye-splice for my 6 mm heat set dyneema rigging (New Enland Ropes HTS-STS). It is a standard masthead rig with cap stays,...
    61 replies | 1693 view(s)
  • bheys's Avatar
    08-06-2018, 12:21 PM
    bheys replied to a thread Gartside 170 in Building / Repair
    Thanks all. Andrew, the rigging process is underway, the sails should be ready in October. The standing rigging is the New England Ropes heat-set...
    202 replies | 46694 view(s)
  • bheys's Avatar
    08-05-2018, 05:48 PM
    bheys replied to a thread Gartside 170 in Building / Repair
    Even though our boat is far from complete, it was fun to finally get her wet. It was a bit nerve racking to experience the first launch. I kept...
    202 replies | 46694 view(s)
  • bheys's Avatar
    08-01-2018, 06:28 PM
    Soft shackles are pretty dang handy. If I tie several in a row they seem to go together without problem. However, I have to consult the directions...
    8 replies | 1114 view(s)
No More Results
About bheys

Basic Information

About bheys
Location:
Corvallis
Interests:
sailing, paddling, gardening, bicycling, woodworking
displayname:
bheys
loginname:
bheys
Also tell us:
1000

Statistics


Total Posts
Total Posts
282
Posts Per Day
0.05
General Information
Last Activity
08-18-2018 12:03 PM
Join Date
04-29-2002
Referrals
0